_____
Location: Le Mars, IA
Project Size: 7,480 sq/ft
Date Completed: February 2025
Services Provided: Design-Build, Pre-Engineered Buildings (Butler)
Fiegen Construction provided erection work for a ready mix batch plant, which included assembling a Butler Pre-Engineered Metal Building with a peak height of 55 feet. In addition to the structural scope, our team also served as the architect for three on-site offices, a breakroom, and a restroom—designing functional, efficient spaces to support the day-to-day needs of plant operations. This project showcases the versatility of our team in delivering both construction and architectural services.